Notepad:Dam

From Kumu Wiki - TRU
Revision as of 10:34, 26 August 2014 by Jfulton (talk | contribs)
Jump to navigation Jump to search

DAM Stages:

Initial consultation stage to determine needs. (December 31,2014

-consult with stake holders; IP, ID’s, Production, Faculty, SME’s to determine what their departments need from a DAM.

-create a questionnaire to provide to stake holders

-design Metatag Scheme

-separate list of needs for video, audio, graphics and stills.

-consult with IT for their expertise



Examination of needs (February 2015)

-asses results of questionnaire


Proof of concept (End of March 2015)

-metatag scheme implemented

-access policy set

-populated with media

-searchable

-testing schedule established with ID’s, SME’s, Faculty.




Video -videos live on barabus -stream on demand (yes) -timecode (toggle?) -metatags


Audio -live on DAM -metatags -timecode


Stills -live on DAM -metatags -sizes


Graphics -live on DAM -metatags -sizes


Metatag Scheme -owner -IPO info -location -subject -keywords -course